Your Location:
Home >
Browse articles >
Research on Construction and Disturbance Control Technologies for Inserting-Knife Rectangular Pipe Jacking in Ultra-Shallow-Buried Composite Strata
Research on Construction and Disturbance Control Technologies for Inserting-Knife Rectangular Pipe Jacking in Ultra-Shallow-Buried Composite Strata
- Railway Standard Design Vol. 70, Issue 10, Pages: 148-158(2026)
DOI: 10.13238/j.issn.1004-2954.202412120003
Revised:2025-04-10
Scan QR Code
Full Text(HTML)
Figs( 17 ) Tabs( 0 )
References
Publication Info
Metrics
17
Views
24
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Inverse Analysis and Application of Deformation Patterns of Anchored Surrounding Rock in Deep-Buried Tunnels under Stress-Disturbance-Seepage Coupling
Study on Rock Breaking Efficiency of Linear Cutting by TBM Disc Cutter in Composite Strata
Study on Cutter Wear Patterns and Influencing Factors of EPB/TBM Dual-Mode Shield in Long-Distance Composite Strata
Design and Application of Cutterhead and Cutting Tool for Super-Large Diameter Slurry Shields in Composite Strata of Underwater Tunnel
Experimental Study on Improvement of Ground Conditioning for Shield Tunneling in Soft-Upper and Hard-Lower Composite Strata
Related Author
JIA Shaobin
MA Yanjun
LI Wei
TANG Liyun
MA Tianyou
YU Yuanxiang
LI Kang
WANG Yihan
Related Institution
Shaanxi College of Communications Technology
China Nuclear Huachen Construction Engineering Co., Ltd.
College of Civil and Architectural Engineering, Xi'an University of Science and Technology
Henan International Joint Laboratory of Modern Green Ecological Storage System
College of Civil Engineering, Henan University of Technology
