Your Location:
Home >
Browse articles >
Parametric Automatic Generation Method for Railway Construction Organization Schedule Images Based on Geometric Primitives
Parametric Automatic Generation Method for Railway Construction Organization Schedule Images Based on Geometric Primitives
- Railway Standard Design Vol. 70, Issue 10, Pages: 73-79(2026)
DOI: 10.13238/j.issn.1004-2954.202411130003
Revised:2025-01-23
Scan QR Code
Full Text(HTML)
Figs( 10 ) Tabs( 0 )
References
Publication Info
Metrics
25
Views
18
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Study on General Design Scheme of Shangyuanmen Yangtze River Tunnel in Nanjing Railway Hub
Construction Organization and Key Construction Techniques of Ji’nan West Railway Station Building on Beijing-Shanghai High-speed Railway
Comparative Study on Construction Themes of a Newly-built Highway Underpassing High-speed Railway
Key Technologies and Application of 132 m Span Steel Truss Girder Swivel Construction across Existing Railway
Buffeting Response of Ballastless Track on Long-Span Cable-Stayed Bridge under Fluctuating Wind Loads
Related Author
QING Weichen
YU Yu
YIN Zhaonian
ZHU Hong
Ding Hui
张向南
ZHAN Min
TAO Tao
Related Institution
China Railway Eryuan Engineering Group Co., Ltd.
Ji’nan Railway Administation Bureau,Ji’nan
铁道第一勘察设计院西安分院
China Railway Fifth Survey and Design Institute Group Co., Ltd.
China Railway Urumqi Group Co., Ltd.
