Your Location:
Home >
Browse articles >
Study on Design of a (80+152+80) m Extradosed Cable-Stayed Bridge for Eastern Guangdong Intercity Railway
Study on Design of a (80+152+80) m Extradosed Cable-Stayed Bridge for Eastern Guangdong Intercity Railway
- Railway Standard Design Vol. 69, Issue 4, Pages: 79-84(2025)
DOI: 10.13238/j.issn.1004-2954.202409060003
Revised:2024-10-09
Scan QR Code
Full Text(HTML)
Figs( 11 ) Tabs( 6 )
References
Publication Info
Metrics
81
Views
18
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Vibration Control Techniques for Stay Cables of Jinhai Super Major Bridge of Zhuhai-Zhuhai Airport Intercity Railway
Design and Innovation of (102+3×178+102) m Extradosed Cable-stayed Extra Large Bridge of Yellow River Bridge on Baotou-Yinchuan High-speed Railway
Design and Technical Innovation of Railway High-Pier Long-Span Asymmetric T-Shaped Rigid-Frame Extradosed Cable-Stayed Bridge—A Case Study of Changwan Lishui Bridge on Qianjiang-Zhangjiajie-Changde Railway
Study on Longitudinal Seismic Mitigation Systems for Three-Tower Cable-Stayed Bridges on Soft Soil Sites
Mechanical Property Analysis of W-shape Web Box Girder in Extradosed Cable-Stayed Railway Bridge
Related Author
ZHAO Haiwei
LIU Pengfei
SHENG Nengjun
SHUI Jing
WANG Zehao
Wenzhang FENG
WANG Hui
JIANG Xiangping
Related Institution
National Key Laboratory of Bridge Intelligent and Green Construction
China Railway Britech Co., Ltd.
speed Sichuan Industrial Development Co., Ltd.
China Railway Design Corporation
China Railway First Survey and Design Institute Group Co., Ltd.
