Your Location:
Home >
Browse articles >
Research on Risk Control Technology for Shield Tunneling Crossing Under-Construction PBA Station
Tunnel/Underground Engineering | Updated:2025-04-11
    • Research on Risk Control Technology for Shield Tunneling Crossing Under-Construction PBA Station

    • YU Peng
    • Railway Standard Design Vol. 69, Issue 4, Pages: 148-156(2025)
    • DOI: 10.13238/j.issn.1004-2954.202309170001     

      CLC:
    • Revised:2023-11-03 ,

    Scan QR Code

  •  
  •  
  • Full Text(HTML)

  • Figs( 17 ) Tabs( 3 )

  • References

  • Publication Info

  • Metrics

Sections
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

41

Views

29

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Tools
  • BibTeXDownload
  • EndnoteDownload
  • RefMan Download
  • NoteExpressDownload
  • NoteFirstDownload

Related Articles

Study on the Deformation of Segment Rings in Operating Shield Tunnel Undercrossed by Shield Tunnel with Ultra-Close Spacing
Study on Bearing Capacity and Safety State Evaluation Method for Submarine Shield Tunnels
Study on Development Law of Segment Misalignment of Curved Shield Tunnels During Construction Period
Research on Longitudinal Crack Propagation Pattern and Mechanical Properties of Shield Tunnels
Research on Metro Squeal Noise Based on Rigid-Flexible Coupling Model

Related Author

LIU Zhijian
CAO Wufu
HUANG Junhong
KOU Dingtao
SHAO Xiaokang
WANG Binglu
JIANG Yusheng
LI Hanyuan

Related Institution

China Railway 14th Bureau Group Corporation Limited
Beijing MTR Construction Administration Corporation
School of Mechanics and Civil Engineering, China University of Mining and Technology
Zhejiang Institute of Communications Co.,Ltd.
College of Civil Engineering,Tongji University