Your Location:
Home >
Browse articles >
Research on Risk Control Technology for Shield Tunneling Crossing Under-Construction PBA Station
Research on Risk Control Technology for Shield Tunneling Crossing Under-Construction PBA Station
- Railway Standard Design Vol. 69, Issue 4, Pages: 148-156(2025)
DOI: 10.13238/j.issn.1004-2954.202309170001
Revised:2023-11-03
Scan QR Code
Full Text(HTML)
Figs( 17 ) Tabs( 3 )
References
Publication Info
Metrics
41
Views
29
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Study on the Deformation of Segment Rings in Operating Shield Tunnel Undercrossed by Shield Tunnel with Ultra-Close Spacing
Study on Bearing Capacity and Safety State Evaluation Method for Submarine Shield Tunnels
Study on Development Law of Segment Misalignment of Curved Shield Tunnels During Construction Period
Research on Longitudinal Crack Propagation Pattern and Mechanical Properties of Shield Tunnels
Research on Metro Squeal Noise Based on Rigid-Flexible Coupling Model
Related Author
LIU Zhijian
CAO Wufu
HUANG Junhong
KOU Dingtao
SHAO Xiaokang
WANG Binglu
JIANG Yusheng
LI Hanyuan
Related Institution
China Railway 14th Bureau Group Corporation Limited
Beijing MTR Construction Administration Corporation
School of Mechanics and Civil Engineering, China University of Mining and Technology
Zhejiang Institute of Communications Co.,Ltd.
College of Civil Engineering,Tongji University
