Your Location:
Home >
Browse articles >
Experimental Study on Preparation of Synchronous Backfill Grouting Materials for Tunnel Walls Using Shield Slurry in Chengdu Metro
Experimental Study on Preparation of Synchronous Backfill Grouting Materials for Tunnel Walls Using Shield Slurry in Chengdu Metro
- Railway Standard Design Vol. 69, Issue 8, Pages: 160-168(2025)
DOI: 10.13238/j.issn.1004-2954.202309060002
Revised:2023-10-25
Scan QR Code
Full Text(HTML)
Figs( 10 ) Tabs( 17 )
References
Publication Info
Metrics
49
Views
17
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Experimental Study on Vibration Isolation Effect of Retaining Piles on Adjacent Metro Vibration
Stability Control of Tunnel Face in Water-Rich Fractured Zone under Coupling Effect of Advanced Drainage and Grouting
A Comparative Study on Effects of Different Layouts of Metro Tunnel Connecting Passages on Piston Wind Acting on Fire Door
Data-Driven Study on Dynamic Evaluation Criteria for Metro Rigid Catenary Systems
Correlation Analysis of Intelligent Shield Tunneling and Settlement Based on Local Outlier Factor Algorithm
Related Author
HUANG Qiwu
WANG Yu
CHEN Jialiang
WANG Zhe
WANG Bo
MA Meng
LIU Chuanxiang
ZHANG Kangjian
Related Institution
Beijing MTR Construction Management Co., Ltd.
School of Civil Engineering, Beijing Jiaotong University
Beijiao Zane Rail Technology(Beijing)Co., Ltd.
Beijing Oriental Yuhong Waterproof Technology Co., Ltd.
State Key Laboratory of Intelligent Geotechnics and Tunnelling, Southwest Jiaotong University
