Your Location:
Home >
Browse articles >
Digital Twin System Development Method for Tunnel Construction Using Drill and Blast Method
Digital Twin System Development Method for Tunnel Construction Using Drill and Blast Method
- Railway Standard Design Vol. 69, Issue 6, Pages: 116-122(2025)
DOI: 10.13238/j.issn.1004-2954.202307060006
Revised:2023-09-01
Scan QR Code
Full Text(HTML)
Figs( 11 ) Tabs( 0 )
References
Publication Info
Metrics
32
Views
39
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Deformation Prediction of Tunnel Surrounding Rock Based on Correlation Analysis and Genetic-Algorithm Optimized BP
Online Monitoring Method for Temperature Field of Subway Screen Doors Based on Digital Twin
Research on Issues Related to Random Evacuation in Passenger Train Fire Accidents in Railway Tunnels
Development and Preliminary Application of a Horizontal Jet Grouting Test Device
Study on Macro-Mesoscopic Mechanical Properties of Anchored Rock Mass and Bolt Support Effect
Related Author
WANG Wenyu
WANG Xiliang
ZHANG Qian
ZHU Xiao
HAO Dengyun
ZHANG Xiao
LI Xu
WANG Huiwu
Related Institution
School of Transportation, Shijiazhuang Tiedao University
Structure Health Monitoring and Control Institute,Shijiazhuang Tiedao University
CSSC Haiwei High-tech Co.,Ltd.
The 713 Research Institute of CSSC
Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University
