Your Location:
Home >
Browse articles >
Preliminary Study on the Performance and Influencing Factors of a New Synchronous Grouting Slurry Based on Slurry Waste from Slurry Shields
Preliminary Study on the Performance and Influencing Factors of a New Synchronous Grouting Slurry Based on Slurry Waste from Slurry Shields
- Railway Standard Design Vol. 68, Issue 9, Pages: 158-165(2024)
DOI: 10.13238/j.issn.1004-2954.202212160002
Revised:2023-01-12
Scan QR Code
Full Text(HTML)
Figs( 8 ) Tabs( 7 )
References
Publication Info
Metrics
28
Views
21
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Experimental Study on Lateral Pressure of Muddy Soil under Closure Effect
Prediction Method for Track Quality Index of High-speed Railway Based on Crossformer
Research on Automated Safety Management and Control Framework for Train Dispatching Commands
Optimal Design of Irregularly Shaped Bellows for Ultra-High-Speed Low-Vacuum Maglev Pipelines
Study on Failure Modes of Surrounding Rock Around Adjacent Twin Tunnels in Layered Rock Masses under Confined Compression
Related Author
LI Xiaokang
YUE Zurun
CHEN Peizhe
GAO Xiaojing
Related Institution
School of Civil Engineering of Shijiazhuang Tiedao University
Key Laboratory of Roads and Railway Engineering Safety Control of Ministry of Education, Shijiazhuang Tiedao University
School of Graduate of Shijiazhuang Tiedao University
