Your Location:
Home >
Browse articles >
Research on Main Process and General Layout of Advanced Repair on EMU Depot
Locomotive Maintenance/Rolling Stocks | Updated:2024-04-24
    • Research on Main Process and General Layout of Advanced Repair on EMU Depot

    • ZHANG Zhengzhou , OUYANG Peng , SONG Dongsheng , HOU Xiaoxiang , HAN Yongjun
    • Railway Standard Design Vol. 68, Issue 4, Pages: 220-226(2024)
    • DOI: 10.13238/j.issn.1004-2954.202211160009     

      CLC:
    • Revised:2023-04-03 ,

    Scan QR Code

  •  
  •  
  • Full Text(HTML)

  • Figs( 2 ) Tabs( 1 )

  • References

  • Publication Info

  • Metrics

Sections
icon
The trial reading is over, you can activate your VIP account to continue reading.
Deactivate >
icon
The trial reading is over. You can log in to your account, go to the personal center, purchase VIP membership, and read the full text.
Already a VIP member?
Log in >

39

Views

24

Downloads

0

CSCD

Alert me when the article has been cited
Submit
Tools
  • BibTeXDownload
  • EndnoteDownload
  • RefMan Download
  • NoteExpressDownload
  • NoteFirstDownload

Related Articles

Quantitative Analysis of Influence Factors of EMU Energy Consumption
Analysis and Optimization of Over Grounding Backflow Characteristics of EMU
The Simulation Analysis of the Influence of EMUs Stop Plan on Operation Efficiency
Research on Traction Calculation and Simulation System of High-speed Railway
Study on General Design Scheme of Shangyuanmen Yangtze River Tunnel in Nanjing Railway Hub

Related Author

ZHANG Yichao
YIN Hao
WU Xiangyang
LIU Lanhua
HE Caisong
HAN Li
LV Xi-kui
SUN Pei-pei

Related Institution

Postgraduate Department, China Academy of Railway Sciences
Energy Saving &Environmental Protection & Occupational Safety and Health Research Institute, China Academy of Railway Sciences Corporation Limited
School of Traffic and Transportation, Shijiazhuang Tiedao University
School of Civil Engineering, Shijiazhuang Tiedao University
School of Electric Engineering, Southwest Jiaotong University