Your Location:
Home >
Browse articles >
Research on Main Process and General Layout of Advanced Repair on EMU Depot
Locomotive Maintenance/Rolling Stocks | Updated:2024-04-24
Research on Main Process and General Layout of Advanced Repair on EMU Depot
- Railway Standard Design Vol. 68, Issue 4, Pages: 220-226(2024)
DOI: 10.13238/j.issn.1004-2954.202211160009
Revised:2023-04-03
Scan QR Code
Full Text(HTML)
Figs( 2 ) Tabs( 1 )
References
Publication Info
Metrics
39
Views
24
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Quantitative Analysis of Influence Factors of EMU Energy Consumption
Analysis and Optimization of Over Grounding Backflow Characteristics of EMU
The Simulation Analysis of the Influence of EMUs Stop Plan on Operation Efficiency
Research on Traction Calculation and Simulation System of High-speed Railway
Study on General Design Scheme of Shangyuanmen Yangtze River Tunnel in Nanjing Railway Hub
Related Author
ZHANG Yichao
YIN Hao
WU Xiangyang
LIU Lanhua
HE Caisong
HAN Li
LV Xi-kui
SUN Pei-pei
Related Institution
Postgraduate Department, China Academy of Railway Sciences
Energy Saving &Environmental Protection & Occupational Safety and Health Research Institute, China Academy of Railway Sciences Corporation Limited
School of Traffic and Transportation, Shijiazhuang Tiedao University
School of Civil Engineering, Shijiazhuang Tiedao University
School of Electric Engineering, Southwest Jiaotong University
