Your Location:
Home >
Browse articles >
Research on Performance of Upper Beam End Integration Device of Long Span Continuous Cable-stayed Bridge of High Speed Railways
Research on Performance of Upper Beam End Integration Device of Long Span Continuous Cable-stayed Bridge of High Speed Railways
- Railway Standard Design Vol. 68, Issue 4, Pages: 63-69(2024)
DOI: 10.13238/j.issn.1004-2954.202208030003
Revised:2022-08-25
Scan QR Code
Full Text(HTML)
Figs( 11 ) Tabs( 5 )
References
Publication Info
Metrics
35
Views
21
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Dynamic Response and Service Performance of Expansive Soil Tunnel under Dynamic Load of a High-Speed Train
Research on Vertical Alignment Control of Ballastless Track Construction for Anhai Bay Large-Span Cable-Stayed Bridge of Fuzhou-Xiamen High-speed Railway
Research on Design Parameters of Main Beam of a Large-Span Steel-Concrete Hybrid Continuous Rigid Frame for High-speed Railway with a Speed of 350km/h
Application of BIM Technology in Construction of Long-Span High-Speed Railway Continuous Rigid Frame Arch Bridge
Design and Innovation of Swivel Steel Box Truss Composite Continuous Girder Bridge for Hefei-Xinyi Railway Crossing Beijing-Shanghai High-speed Railway
Related Author
YU Hang
FENG Ying
ZHU Xingyu
WANG Xun
ZHANG Zhiqiang
HUANG Zhibin
WANG Pinhao
LI Binbin
Related Institution
State Key Laboratory of Intelligent Geotechnics and Tunnelling, Southwest Jiaotong University
School of Civil Engineering, Southwest Jiaotong University
China Railway No.9 Group Co., Ltd.
The Second Engineering Co., Ltd., China Railway No. 9 Group
Dongnan Coastal Railway Fujian Co., Ltd.
