Your Location:
Home >
Browse articles >
Research on Rebar Tying Robot for High-Speed Railway Precast Box Beams Based on 3D Vision Recognition and Automatic Tying Numerical Control System
Research on Rebar Tying Robot for High-Speed Railway Precast Box Beams Based on 3D Vision Recognition and Automatic Tying Numerical Control System
- Railway Standard Design Vol. 70, Issue 10, Pages: 115-123(2026)
DOI: 10.13238/j.issn.1004-2954.202501130007
Revised:2025-02-18
Scan QR Code
Full Text(HTML)
Figs( 30 ) Tabs( 0 )
References
Publication Info
Metrics
16
Views
18
Downloads
0
CSCD
Alert me when the article has been cited
Submit
Tools
- BibTeXDownload
- EndnoteDownload
- RefMan Download
- NoteExpressDownload
- NoteFirstDownload
Related Articles
Transient Flow Field of Noise Barriers on Both Sides of a Bridge Deck Induced by 400 km/h High-speed Trains
Carbon Reduction Optimization of Simply Supported Steel-Concrete Composite Beams for High-speed Railway Based on Particle Swarm Optimization Algorithm
Preliminary Study on Automatic Layout Algorithm for Railway Bridge Span Schemes
Crack Propagation of Bridge Top Slab and Influence on Vibration Energy Distribution Under High-Speed Train Running Excitation
Study on a New Method for Measuring and Controlling the Plane Position of Ballastless Track Panels on Long-Span Cable-Stayed Bridges for High-Speed Rail
Related Author
YANG Bo
LU Bin
ZHANG Xun
CHEN Keer
DONG Chaoxi
YAN Yusheng
BAI Huajun
ZHENG Hong
Related Institution
Changsha Social Work College
Key Laboratory of Traffic Safety on Track(Ministry of Education), Central South University
School of Civil Engineering, Southwest Jiaotong University
State Key Laboratory of Bridge Intelligent and Green Construction, Southwest Jiaotong University
China Railway First Survey and Design Institute Group Co., Ltd.
